STS-8 - View of the INSAT/PAM-D being deployed - Credit: NASA.
Spacecraft data:
Prime contractor
Ford Aerospace
Platform
INSAT
Operator
Mass at launch
1152 kg
Mass in orbit
650 kg
Basic shape
Dimension (m)
2.18 x 1.42 x 1.55 m
Solar array
asymmetric panel, 11.5 m²
Stabilization
3-axis
DC power
1185 W
Design lifetime
active: 7 yrs
Location:
Date
Position
Remarks
Sept 1983
74 °E
°
Decay:
Out of service:
Aug 1993
Cause:
Mission details:
When Insat-1B was launched on 30 August 1983, it almost suffered the same fate as the Insat-1A. It was not until
mid-September that Ford and Indian controllers succeeded in deploying its solar array. By then it had been stationed at
74°E in place of Insat-1A. Full operational capability was achieved in October 1983. It continued to operate into 1990
with all its 4375 two-way voice or equivalent circuits in use. Around 36,000 earth images were returned.